In the six years since its
inception and formation, MEM
Engineering has been crucial to
the completion of hundreds of successful projects both in
the UK and mainland Europe. Here is a small cross-section
of our work:
 |
Vink
Systemen BV
TNO, Delft, Netherlands
Sub-Contracted Labour
Installation of complete
new HVAC system to eight storey office block, including
full fan room installation & floor level distributions
(air handling units, ventilation ducting, heat exchangers,
automatic control valves & fire dampers)
|
GTI
Industriele Services Noord BV
Schlomer Shipyard, Leer, Germany
Build No. 603
Fabrication and installation
of carbon and stainless steel pipewor, 2-12 inch diameter
on engine room & cargo ballast systems.
Fabrication and installation
of hydraulic pipework, including system flushing and
pressure testing.
Fabrication and installation of associated pipework
structures, supports and penetrations. |
 |
Grootint
B.V.- Heerema Fabrications
Zwijndrecht, Netherlands
Wintershall, D15-FA-1 Statoil, Karsto - PAR's
Providing on site supervision, labour, and tooling to undertake:
a) Structural pre-fabrication, assembly and welding of top side modules.
b) Full pipe work pre-fabrication, erection, and pressure testing, of 50 - 900 mm pipe
spools in carbon steel, chrome-moly, duplex, super duplex and stainless steel.
|
Swan
Hunter (Tyneside) Ltd
Wallsend, UK
Elf, Elgin/Franklin Development
Structural fabrication of skids and sub-sea tie in structures, and load out and sea fastenings.
Sub-sea template pipe work pre-fabrication, erection, bolt tensioning, and pressure testing.
|
|
|
Imtech Marine & Industry
Rotterdam, Netherlands
Scheepswerf Visser, Den Helder - 4 Coast Guard Landing Vessels
IHC, Kinderdijk - Arco Humber
Verolme Botlek, Rotterdam - J-Lay (Huisman)
Van der Giessen de Noord, Krimpen a/d Ijssel - Queen of Penta Ocean
Providing on site supervision and labour, to undertake the electrical installation, glanding, termination, and commissioning works of the Main and Emergency switchboards, Bridge and Machinery consoles and associated equipment's, Control, Alarm and L.P. / H.P. distribution panels. All work was undertaken on behalf of the
"Original Equipment Manufacturer".
|
Federal Mogul (UK) Ltd.
Sunderland, U.K.
Installation of new conveyor system.Civil and structural steel modifications over two floor levels of the foundry, in preparation for the installation of a new conveyor system.
Electrical and utility pipe work alterations, modifications and new installations to accommodate the installation of the new conveyor.
Installation and commissioning of new sand re-cycling conveyor system linking the moulding section to the sand cleansing / filtering sections of the plant.
|
 |
Swan Hunter ( Tyneside ) Ltd.
Wallsend, U.K.
Kerr McGee - Leadon Project, FPSO Global Producer 111
Top side module pipe pre-fabrication, erection, bolt tensioning and hydro testing.
On completion of installation works, all fluid handling and processing systems were commissioned and tested to clients satisfaction. Total work scope was in excess of 60,000 man hours.
|
Bevico B.V.
Katwijk, Netherlands
Ultrama J-6A Gaz de France PL-K12-PC
Undertaking Off-shore platform maintenance and HVAC System up grading, whilst platforms remain in service. Including full internal duct cleaning of all accommodation spaces, operation and control rooms, kitchen exhaust trunking, air handling units, heat exchangers and inlet and exhaust fan housings.
Up grading of fire dampers, automated flow control valves, and filtration systems.
|
 |
Heerema Fabrications
Zwijndrecht, Netherlands
Esso Angola - Kizomba "A" FPSO Topsides & Integration
Shell (SNEPCO) - Bonga FPSO Topsides
Provision of on site management, supervision, and labour to undertake the structural pre-fabrication, and erection, of topside modules at the clients site.
Transfer of personnel to off site location to continue through to completion, the integration phase of the construction project.
|
Vink Systemen B.V.
Katwijk, Netherlands
HVAC Duct System Components
Production of HVAC duct system sheet metal and stainless steel components.
This including the fabrication and manufacture of system components for the construction and commercial building industry, and the marine and off-shore industries. Included were the production of air handling units, inlet and exhaust fan housings, as well as square, rectangular, tubular and spiral duct sections, and all the associated fittings and components.
Installation, testing and commissioning of HVAC systems in commercial buildings,
on marine vessels, and on off-shore platforms.
|
 |
AMEC Upstream Oil & Gas
Wallsend, U.K.
Shell (SNEPCO) - Bonga FPSO Topsides & Integration
Provision of supervisors, and skilled labour to undertake the mechanical fitting, structural steel fabrication, and pipe erection works at the client's site, during the topside module construction and integration phases of the project.
|
Neptunus Marine Construction
Aalst, Netherlands
45m Millennium Super Yacht
To undertake at the clients site, the construction and out fitting of a Mulder Designed 45 metre high speed aluminium super yacht, with a team of aluminium fabricators, welders, and fitters.
|
|